Turbine part re-condition and repairing
Subject |
: |
Turbine rotor shaft re-condition, replace spacer ring and carbon sleeve ring. |
Turbine Type |
Back pressure steam turbine generator 4 MW |
|
Brand |
: |
Ebara Turbine [Japan] |
Customer |
: |
Banpong Sugar Mill Co.,Ltd. |
Factory |
: |
Sugar mill |
Location |
: |
Ratchaburi Province |
Subject |
: |
Turbine rotor shaft bearing re-pair and re-condition. |
Turbine Type |
Back pressure steam turbine 95 kW |
|
Brand |
: |
Shin nippon Turbine [Japan] |
Customer |
: |
Banpong Sugar Mill Co.,Ltd. |
Factory |
: |
Sugar mill |
Location |
: |
Ratchaburi Province |
Subject |
: |
Turbine rotor carbon ring shafting re-condition and hard chromming, Rotor blade ash blasting. |
Turbine Type |
Back pressure steam turbine 1.2 MW |
|
Brand |
: |
KKK Turbine [German] |
Customer |
: |
Jebsen & Jessen Technology (T) Ltd. |
Factory |
: |
Palm mill plant |
Location |
: |
Surat Thani Province |
Subject |
: |
Turbine break down: Extend turbine shaft DE, Replace thrust collar, Replace seal strip, Replace labyrinth gland seal, re-babbitt bearing re-condition bearing shafting NDE . |
Turbine Type |
Fully condensing steam turbine generator 6 MW |
|
Brand |
: |
Hangzhou Turbine [China] |
Customer |
: |
Bua Sommai Co,Ltd. |
Factory |
: |
Rice mill plant |
Location |
: |
Roy ei Province |